Advice · Comfort
MVHR and air conditioning
Not long ago, ventilation in a British home meant opening a window, and air conditioning was something you had on holiday. That’s changing. Our homes are more airtight than ever, and our summers are getting hotter. So two systems most of us never thought about are now worth planning for: MVHR for fresh air, and air conditioning for the hottest days.
Why it’s time to think about them
Summer 2026 was the UK’s hottest on record, beating the record set just a year earlier. The Met Office says climate change made a summer like it around 130 times more likely, and that our summers will keep getting hotter.
At the same time, we’re building and renovating homes to keep the heat in: more insulation, better windows and fewer gaps. That’s great for winter bills. But an airtight house needs proper ventilation, and a well-insulated house that does get hot in summer is slow to cool down.
And in London, opening the windows isn’t always the answer. Traffic noise, pollution and security keep a lot of bedroom windows shut at night, just when the house needs to cool down.
MVHR: fresh air without losing the heat
MVHR stands for mechanical ventilation with heat recovery. A small unit, usually in the loft or a cupboard, runs quietly all the time. Through ducts, it takes stale, damp air out of the kitchen, bathrooms and utility room, and brings fresh, filtered air into the bedrooms and living rooms. On the way, the two air streams pass each other in a heat exchanger, so the warmth of the air going out heats the fresh air coming in, without the two ever mixing.
- Fresh air all the time, even with the windows shut.
- Filtered air, so less dust and pollen comes in.
- Less condensation and mould.
- Most of the heat stays in the house, which is what a well-insulated home needs.
The Building Regulations already say a very airtight new home can’t rely on opening windows and extractor fans: it needs continuous mechanical ventilation, and MVHR is the kind that keeps the heat. In a Passivhaus, it’s part of the design from day one.
What MVHR doesn’t do is cool the house. Most units have a summer bypass, which brings in cool night air without warming it, and that helps. But MVHR moves too little air to cool a house on a hot day.
It also needs planning. There has to be space for the unit and for ducts to every room, which is easiest when you’re building or the ceilings are down. It has to be designed, balanced and set up properly, or it can be noisy and won’t work as it should. And the filters need cleaning or changing regularly, often every few months, so the unit has to be easy to get to.
Air conditioning: for the hottest days
First, the honest part: air conditioning should be the last step, not the first. The Building Regulations for new homes say the same: keep the sun out first, with shading and the right amount of glass, let the heat out with windows and ventilation, and use mechanical cooling only where that isn’t enough. Otherwise you pay every summer to cool heat you could have kept out.
Most air conditioning in UK homes is an air-to-air heat pump: a slim indoor unit on the wall or in the ceiling, connected by pipes to a unit outside. It also works in reverse, so in winter the same unit can heat the room, very efficiently.
It makes the biggest difference in the rooms that get hottest: top-floor bedrooms and loft conversions, rooms with big south- or west-facing windows, and bedrooms where the windows have to stay shut at night. It also matters for anyone who struggles in the heat, like older people and babies.
- The outdoor unit. Plan where it goes: away from bedroom windows, yours and your neighbours’, and somewhere it can be serviced.
- Planning permission. In England, many outdoor units no longer need it, as long as they meet size and noise limits. Listed buildings, flats and conservation areas can be different, so check first.
- Pipes and power. Plan the route for the pipes, the condensate drain and the electrical supply.
- A qualified installer. Most units contain refrigerant gases that, by law, only a certified engineer can handle.
- Grants. Since July 2026, air-to-air heat pumps can qualify for a £2,500 grant through the government’s Boiler Upgrade Scheme in England and Wales. Your installer can check if your home is eligible.
Portable air conditioners are a stopgap: they’re noisy and far less efficient. In a well-insulated home, one small fixed unit goes a long way.
Worried it will spoil the design?
A lot of people worry that air conditioning will spoil the look of their home: a white box on the wall inside, and another one outside. It doesn’t have to be like that. There are units made to be built in, and a good architect can design around them, so the air conditioning becomes part of the joinery rather than something stuck on afterwards.
- Ducted units. The unit hides in the ceiling, a bulkhead or the loft, and all you see in the room is a slim grille. One unit can often serve more than one room.
- Built into the joinery. A unit can sit above a wardrobe, in a window seat or in a bookcase, behind a grille designed as part of the cabinet.
- Ceiling cassettes. These sit in the ceiling with only a flat panel showing, so there’s no box on the wall.
- One outdoor unit for several rooms. A multi-split system runs several indoor units from one outdoor unit, which can go out of sight on a flat roof, in a side return or behind a slatted screen.
The same goes for MVHR: the unit can live in the loft or a utility cupboard, and the ducts can end in neat ceiling valves or slim slot grilles that suit the design.
The secret is to plan it together from the start: the architect, the joiner and the installer. The joinery has to leave room for the unit, let enough air in and out, and give easy access for cleaning the filters and servicing. A screen around an outdoor unit has to let it breathe. And the condensate pipe and the power need a route. Get those right, and the air conditioning disappears into the design. Get them wrong, and it will be noisy, inefficient and hard to look after.
Plan them in early
The best time to think about MVHR and air conditioning is before the work starts. With the walls open and the ceilings down, ducts, pipes and cables cost far less to put in than they will later. And even if you’re not ready for air conditioning yet, the pipes and power can go in now, ready for the day you need it.
Since June 2022, every new home in England has had to be checked for overheating. Extensions and renovations don’t have to be, so it’s worth asking the question yourself.
What to ask your designer and builder
- Will the house be airtight enough to need MVHR? If so, where will the unit and the ducts go?
- Which rooms are most likely to overheat, and why?
- What shading would keep the summer sun off the big windows?
- Where could the outdoor unit go, how will it be screened, and would it need planning permission?
- Can the indoor units be hidden in the ceiling or built into the joinery?
- Can the ducts, pipes and power go in now, ready for later?
Planning a new home or a renovation?
Talk to us early, while there’s still room in the design for ducts and pipes. We’ll meet you at home and listen to your priorities and budget.